Georgia Power (Residential) Bill Calculator - Effective For Bills Rendered On Or After July 1, 2014

Note: This bill calculation routine applies only to residential customers who do not own their own transformers (i.e., customer type = secondary) and who are receiving service under the standard Residential Service Schedule (R-20) and Fuel Cost Recovery Schedule (FCR-23), and additionally are subject to the terms and rates of the following riders: Environmental Compliance Cost Recovery Schedule (ECCR-3), Demand Side Management Schedule (DSM-R-5), Nuclear Construction Cost Recovery Schedule (NCCR-4), Municipal Franchise Fee Schedule (MFF-3), and Green Energy Tariff (GE-4), and Nuclear Waste Fund Rider (NWFR-1) 7.  For more details regarding Georgia Power's residential tariff offerings, visit:

                  www.georgiapower.com/pricing/residential/residential-tariffs.cshtml
Enter Your Monthly Usage in Kilowatt Hours (kWh):
Enter # of Premium Green Energy Blocks Purchased:
Enter # of Standard Green Energy Blocks Purchased:
Enter Billing Cycle End Date:
Choose Number of Days In Billing Period
Billing Cycle Start Date(Automatic):
Do you receive a Senior Citizen's Discount? 1
Is your residence INSIDE the city limits of your city? 2
Are You Being Assessed The Smart Meter Opt-Out (OPT-1 Line Item on Bill) Fee? 3
Enter Sales Tax: %
  
Base Charge:
Smart Meter Opt-Out Charge (May Not Apply):
Total Cost for kWh Usage:
  Tier 1 Component (kWh):
  Tier 2 Component (kWh):
  Tier 3 Component (kWh):
Senior Citizen Discount:
Base Bill:
Fuel Cost Rider:
Senior Citizen Fuel Cost Recovery Credit:
Demand Side Management Residential Rider:
Current Service Subtotal:
Environmental Compliance Cost Recovery Rider:
Nuclear Construction Cost Recovery Rider:
Franchise Fee:
Green Energy:
Total (excluding tax):
Sales Tax:
TOTAL (w/ tax) :
* Please note that the Summer Rate Scale reflects tiered rates that increase as your kWh usage increases. The Winter Rate Scale reflects tiered rates that decrease as your kWh usage increases.
Summer Rate Schedule
Tier Usage Cost per kWh
1st tier up to 650kWh
2nd tier next 350kWh
3rd tier over 1000kWh
Winter Rate Schedule
Tier Usage Cost per kWh
1st tier up to 650kWh
2nd tier next 350kWh
3rd tier over 1000kWh
Environmental Compliance Cost Recovery Schedule4
All kWh
% of Base Revenue
(Base Charge + kWh Charge  - Sr. Citizen Discount)
Nuclear Construction Cost Recovery Schedule5
All kWh
% of Base Revenue
(Base Charge + kWh Charge - Sr. Citizen Discount)
Fuel Cost Recovery Rider
June - Sept. Oct. - May
Cost Per kWh
Franchise Fee Schedule
Inside
City Limits
Outside
City Limits
% of Total Revenue
Demand Side Management Residential Rider6
All kWh
% of Base Revenue
(Base Charge + kWh Charge
 - Sr. Citizen Discount)
Green Energy
Cost
Per 100 kWh Block - Premium
Per 100 kWh Block - Standard
Recent Tariff Updates Since January 1, 2014
Tariff Start Date Expiration Date
IFR-1 N/A 5/31
NWFR-1 7/1 N/A
1- You are eligible for the Senior Citizen Discount if you are at least 65 years old and your total household income is not more than twice the Federal Poverty Level( aspe.hhs.gov/poverty/index.shtml#latest ), or $21,780 annually. To apply for the Senior Citizen Discount, contact Georgia Power at 1.888.660.5890.
2- Franchise Fees are collected based on electric service inside or outside of city limits. If you live within the city limits of a city with which Georgia Power does NOT have a franchise agreement, you will pay as outside the city limits. If you are not sure, contact GPC at 1.888.660.5890.
3- The Smart Meter Opt Out Fee is a Monthly Surcharge Approved By the Commission Designed to Allow the Georgia Power Company to Recover Costs Associated with Manual Meter Reading. The Monthly Fee is an Incrase of $19.00 to the Customer's Base Bill To Which Other Taxes and Surcharges Will Apply.
4- The Environmental Compliance Cost Recovery Rider was established to recover capital costs and operating and maintenance costs associated with government mandated environmental costs.
5- The Nuclear Construction Cost Recovery Rider is a surcharge created by state legislative mandate, SB 31, passed in the 2010 General Assembly that became effective January 1, 2011, to recover financing costs associated with the construction of two new nuclear units at Plant Vogtle.
6- The Residential Demand Side Management Residential Rider is a surcharge established by the Commission to support Georgia Power Company in its energy conservation initiatives.
7- The Nuclear Waste Fund Fee Rider is a credit established by Georgia Power Company with the approval of the Commission to reflect reduction of the fee to zero in current fuel rates. The fee, which was required to be paid to the Dept of Energy pursuant to the Nuclear Waste Policy Act, was formally set to zero and will take effect beginning in July, and will remain at zero until such time the fee is reset by DOE or rates are reset in the next fuel proceeding.
DISCLAIMER: The Georgia Public Service Commission ("Commission") makes this bill calculator available so that residential consumers can check the accuracy of electric bills that they receive from Georgia Power Company ("Company") dating back to the billing month coinciding with the effective date of the most recent tariff update. While the Commission believes that the results generated by this bill calculator are correct, the Commission cannot and does not guarantee this to be the case due to factors beyond its control that include, but are not limited to, the rounding of numbers by the Company, application of state and local taxes, etc. Discrepancies may also result if billing cycle overlaps a caldendar year. If, after calculating your bill with this calculator, the results you obtain differ from the charges assessed by the Company, please contact Georgia Power at 1.888.660.5890 to inquire about any discrepancies that may result.